Tecominoacán

Work

“Engineering, procurement, construction and commissioning of electromechanical work in the Tecominoacán separation battery (second stage)”.

Objective

Adapt the Tecominoacán separation battery, in second stage, for the management of the production of the quesqui field in high pressure with capacity to separate up to 600 MMPCSD of wet sour gas and 100 MBPD of liquid hydrocarbons with the processes of three-phase separation, air coolers, and secondary rectification, interconnection to the existing exhaust system.

Justification

One of the main functions of Pemex exploration and production is to carry out studies, manage wells, fields and hydrocarbon reserves in order to comply with production programs. The adaptation of the Tecominacán separation battery will have the function of separating the liquid hydrocarbon and the gas coming from the wells of the Quesqui field.

Tren Interurbano Tijuana

It will change the city’s transportation system and improve the quality of life of its citizens.

Introduction

The project consists of the operation of an urban passenger train connecting the San Ysidro border crossing with the eastern part of the municipality of Tijuana.

Rehabilitation of 27.4 km.

Located in the metropolitan area of the municipalities of Tijuana and Tecate, in the State of Baja California.

Objectives 

  • Improve mobility in the city
  • Reduce travel times
  • Reduce pollution
  • Reduce traffic congestion

Social Benefits

  • Time reduction
  • Financial aspects (save up to 50% on current expenses)
  • Right of way
  • Strategic connections
  • Quality transportation
  • Increased safety
  • Health benefits
  • Quality of life

Economic benefits 

-Commercial development (Implementation and growth of businesses in and around the stations).

-Jobs generated by the project (2,000 jobs will be generated during the construction stage; once completed, 120 people will be needed to operate the Tren Interurbano Tijuana).